Manufactured in India, supplied in Haridwar
Soundproofing materials in Haridwar
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Haridwar. Haridwar combines pilgrimage hospitality with a substantial industrial estate, so we supply assembly halls and plant rooms from the same district.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.
01 / Start here
What this material is and where it earns its place in Haridwar
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Haridwar is mostly ashrams and guest accommodation, assembly halls, industrial units, hotels, schools, clinics.
RC frame houses and hotels built on slopes, with hard floors and cold external walls in the hill towns.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Haridwar.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification sheet
The numbers, and they do not move by city
These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
03 / Local conditions
What we see driving Haridwar briefs
- Seasonal surges
Occupancy swings enormously through the year. Rooms have to work when the building is completely full, which is when it is judged.
- Very large assembly spaces
Halls holding large gatherings in hard masonry, where speech stops being intelligible well before the room sounds wrong.
- Industrial estate work
Machinery and plant close to occupied areas, where enclosure at the source is the reliable answer.
- Next day from the plant
A short run, so freight is cheap and samples arrive quickly.
- Plant and HVAC
Hotel plant, boilers and generator sets close to guest rooms in compact hillside buildings.
- The housing stock
RC frame houses and hotels built on slopes, with hard floors and cold external walls in the hill towns.
If you are specifying for a Haridwar project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
04 / Conditions
The Haridwar climate decides the material list
Haridwar is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Supply
How material reaches a Haridwar site
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | next day |
| Dispatch | 2 to 4 working days |
| To site | next day |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly two hundred and eighty kilometres, normally next day on a dedicated truck.
06 / Straight talk
Four honest warnings before you buy
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
Local approvals that nobody actually holds
We hold no Haridwar certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.
07 / In projects
The product on finished jobs
Haridwar: questions we are actually asked
Are these soundproofing materials made in Haridwar?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Haridwar as the manufacturer rather than through a dealer. Haridwar combines pilgrimage hospitality with a substantial industrial estate, so we supply assembly halls and plant rooms from the same district. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Haridwar job?
Occupancy swings enormously through the year. Rooms have to work when the building is completely full, which is when it is judged. Halls holding large gatherings in hard masonry, where speech stops being intelligible well before the room sounds wrong. Those two things move the build-up far more than the panel figure does.
Is this the right material for Haridwar conditions?
Haridwar is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
How quickly can material reach a site in Haridwar?
made at: Our own plant, Palwal, Haryana, reaches site in: next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
Where do soundproofing materials fail to help?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
How is the order packed and what is the minimum?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.