Manufactured in India, supplied in Gurugram
Soundproofing materials in Gurugram
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Gurugram. Gurugram is eighty kilometres from our plant.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / The material
What you are buying, and what it fixes in Gurugram
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Gurugram is mostly corporate towers, high-rise condominiums, hotels, restaurants, clinics, schools, studios.
Builder floors and RC frame apartments with tile and stone floors, often built floor by floor for separate households.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Gurugram.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
The numbers, and they do not move by city
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
03 / In this market
What the buildings in Gurugram do to the specification
- Glass floor to ceiling
Full height glazing, raised floors and exposed slabs leave nothing to absorb anything. The ceiling plane carries the whole room.
- Generators are constant
Power backup runs often enough to be a permanent condition, and it sits close to occupied space. Enclosure at the source is the answer.
- Condominium party walls
The same separating detail across hundreds of flats in a tower. Worth solving on the drawing rather than after possession.
- Eighty kilometres from the plant
Same or next day delivery, quick samples, and a site visit when the room is difficult.
- Plant and HVAC
Dense industrial belts mean compressors, presses, generator sets and blower plant sit close to offices and canteens.
- The housing stock
Builder floors and RC frame apartments with tile and stone floors, often built floor by floor for separate households.
Architects working in Gurugram usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
04 / Durability
What the Gurugram climate rules in and rules out
Gurugram is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Supply
Getting it to Gurugram, with real dates
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | a day |
| Dispatch | 2 to 4 working days |
| To site | a day |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
Same day or next day by road from Palwal, about eighty kilometres. Small consignments on a shared vehicle, full loads on a dedicated truck.
06 / Read this first
Four honest warnings before you buy
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Square footage quoted before the room is understood
Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.
-
A claim of being local to Gurugram
We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.
07 / In projects
The product on finished jobs
Gurugram: questions we are actually asked
Is there a Gurugram factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Gurugram as the manufacturer rather than through a dealer. Gurugram is eighty kilometres from our plant. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Gurugram job?
Full height glazing, raised floors and exposed slabs leave nothing to absorb anything. The ceiling plane carries the whole room. Power backup runs often enough to be a permanent condition, and it sits close to occupied space. Enclosure at the source is the answer. Those two things move the build-up far more than the panel figure does.
Will this material last in the Gurugram climate?
Gurugram is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
What is the delivery time into Gurugram?
made at: Our own plant, Palwal, Haryana, reaches site in: a day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
Where do soundproofing materials fail to help?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
How is the order packed and what is the minimum?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.