Manufactured in India, supplied in Goa
Soundproofing materials in Goa
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Goa. Goa is hospitality, coastal damp and a licensing conversation about how loud a venue can be after dark.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / What it is
The material, and what it actually does on a Goa job
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Goa is mostly resorts and hotels, beach clubs and restaurants, villas, guest rooms, clinics, offices.
Villas, apartments and older Portuguese era houses with tile and stone floors, in a humid coastal climate with heavy monsoon.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Goa.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification
The published figures, unchanged by location
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / On the ground
The Goa conditions that change the answer
- Loud inside, quiet at the boundary
A club or beach venue has to hold its energy and keep it off the neighbours after hours. That is containment, and it decides whether the operation keeps trading.
- Guest rooms fail at the door
Corridor noise and the room next door generate more complaints than the room acoustics ever do. Door and wall detailing does that work.
- Salt air and heavy monsoon
PET felt does not absorb moisture, rot or feed mould, which matters where mineral products sag within a single season here.
- Season dates are fixed
The season does not move. We give real dispatch and transit dates so a fit-out is not waiting on a truck.
- Plant and HVAC
Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
- The housing stock
Villas, apartments and older Portuguese era houses with tile and stone floors, in a humid coastal climate with heavy monsoon.
For a Goa practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Conditions
Durability in Goa, before acoustics is discussed
Goa is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The risk we design against here is mould, sagging fabric finishes and swelling in timber.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Logistics
How material reaches a Goa site
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | three to four days |
| Dispatch | 2 to 4 working days |
| To site | three to four days |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly sixteen hundred kilometres, normally three to four days on a dedicated truck.
06 / Worth knowing
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Square footage quoted before the room is understood
Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.
-
Local approvals that nobody actually holds
We hold no Goa certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.
07 / In projects
How it looks once it is installed
Goa: questions we are actually asked
Is there a Goa factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Goa as the manufacturer rather than through a dealer. Goa is hospitality, coastal damp and a licensing conversation about how loud a venue can be after dark. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Goa job?
A club or beach venue has to hold its energy and keep it off the neighbours after hours. That is containment, and it decides whether the operation keeps trading. Corridor noise and the room next door generate more complaints than the room acoustics ever do. Door and wall detailing does that work. Those two things move the build-up far more than the panel figure does.
Is this the right material for Goa conditions?
Goa is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.
How does an order actually travel to Goa?
made at: Our own plant, Palwal, Haryana, reaches site in: three to four days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
What will soundproofing materials not do?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
How is the order packed and what is the minimum?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Send a plan and a section, get a real build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.