Home > Egypt > Ceiling baffles and clouds

Acoustic hanging ceiling baffles in a large open space

Manufactured in India, supplied in Egypt

Ceiling baffles and clouds in Egypt

We manufacture ceiling baffles and clouds at our own plant at Palwal in Haryana, India, and supply them into Egypt. Made at our own plant in India and shipped into Alexandria, Port Said or Sokhna.

Material
100% PET non-woven, the panel family
Thickness
9 to 24 mm
Size
Made to the drawing, standard and custom
Exposure
Both faces work, which is why suspended area outperforms the same area laid flat
Test standard
ASTM C423
Lead time
Confirmed against the drawing
Minimum order
500 sq ft, about 46 sq m
  • ASTM C423
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.

01 / What it is

The material, and what it actually does on a Egypt job

PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. It is how you treat a room with exposed services, where there is no ceiling to line.

Work reaching us from Egypt is mostly new development and government buildings, hotels and resorts, offices, hospitals, schools, venues.

Reinforced concrete frames with block infill and hard tile floors, in blocks that sit close together with narrow light wells between them.

  • Vertical baffles Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.
  • Horizontal clouds Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.
  • Mixed with services Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
  • What it will not do Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for baffles and clouds are on the main product page. This page covers what that means for a project in Egypt.

Acoustic ceiling baffles Acoustic ceiling clouds Acoustic ceiling tiles

02 / The numbers

One specification sheet, the same in every market

We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.

  • EchoCore 151500 GSM. Offices, retail, general
  • EchoPro 181800 GSM. Halls, atria, spaces with a target
  • EchoMax 222200 GSM. High volume and high occupancy
Ceiling baffles and clouds: published specification
Material100% PET non-woven, the panel family
Thickness9 to 24 mm
SizeMade to the drawing, standard and custom
ExposureBoth faces work, which is why suspended area outperforms the same area laid flat
Test standardASTM C423

On a Egypt job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

03 / In this market

What the buildings in Egypt do to the specification

  • Convenient sailings

    Our routes to Europe already pass this way, which keeps frequency good and freight competitive.

  • Development at scale

    Very large single orders where the same detail repeats across many buildings. Batch consistency matters more than the figure on one sheet.

  • Heat, dust and sealed buildings

    Closed up with heavy cooling, so plant noise accumulates inside and rooms stay hard and live.

  • Assembly and function spaces

    Large halls in concrete and stone where speech stops being intelligible well before the room sounds wrong.

  • School and campus buildings

    Classrooms are concrete and tile with very large class sizes and street noise through open windows.

We would rather argue about the build-up at design stage than on site. See how we support architects.

04 / Durability

The Egypt climate decides the material list

Egypt is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the sensible material list before acoustics is even discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The risk we design against here is dust ingress and thermal movement in long runs.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

05 / Route to site

Getting it to Egypt, with real dates

Supply into Egypt
Ships fromPalwal, Haryana, India
Arrives atAlexandria, Port Said or Sokhna, then road to site
Dispatch4 to 7 working days
FreightSea via Alexandria or Port Said
PackingFlat packed with fixings, sets labelled by row so the install sequence matches the drawing.
Lead timeConfirmed against the drawing. Standard sizes 4 to 7 working days.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Alexandria, Port Said or Sokhna, then road to site. Air freight for samples and urgent quantities.

The same 500 sq ft minimum applies on export.

Minimum order, ceiling baffles and clouds
Baffles and clouds500 sq ft, about 46 sq m

Baffles and clouds are cut to the drawing, so the minimum is counted on finished panel area. Both faces of a hung baffle absorb, which is why coverage taken off a plan understates what the order actually does.

06 / Straight talk

What we will tell you that a reseller will not

  • The wrong product for the problem

    Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • Local approvals that nobody actually holds

    We hold no Egypt certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.

FAQ

Egypt: questions we are actually asked

Where are the ceiling baffles and clouds you supply to Egypt actually made?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Egypt as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Alexandria, Port Said or Sokhna. You buy at factory prices with one consistent batch across the order.

What decides the specification for a Egypt project?

Our routes to Europe already pass this way, which keeps frequency good and freight competitive. Very large single orders where the same detail repeats across many buildings. Batch consistency matters more than the figure on one sheet. Those two things move the build-up far more than the panel figure does.

Will this material last in the Egypt climate?

Egypt is hot and dry for most of the year, with dust and high daytime surface temperatures. Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves. The failure we design against here is dust ingress and thermal movement in long runs.

When would material land on a Egypt site?

ships from: Palwal, Haryana, India, arrives at: Alexandria, Port Said or Sokhna, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Where do ceiling baffles and clouds fail to help?

Baffles are efficient, not magic. In a very tall volume the height above the baffle line still rings, and the honest answer is either more area or accepting a higher RT, not a denser panel.

Is there a minimum order, and how does it arrive?

The same 500 sq ft minimum applies on export. Baffles and clouds, 500 sq ft, about 46 sq m. Baffles and clouds are cut to the drawing, so the minimum is counted on finished panel area. Both faces of a hung baffle absorb, which is why coverage taken off a plan understates what the order actually does. Flat packed with fixings, sets labelled by row so the install sequence matches the drawing.

Next step

Drawings in, BOQ and a delivered date out

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.

script src="/assets/vendor/glightbox/js/glightbox.min.js">