Manufactured in India, supplied in Dubai
Soundproofing materials in Dubai
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Dubai. Made at our own plant in India and shipped into Jebel Ali.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.
01 / Start here
What this is, and what it changes in a Dubai room
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Dubai is mostly hotels and fit-out, towers and apartments, retail and malls, offices, clinics, studios.
Towers and villas are concrete and block with stone or porcelain floors throughout. Mass is not the problem, impact noise and live rooms are.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Dubai.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification
The numbers, and they do not move by city
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Where a consultant is already engaged on a Dubai project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
03 / In this market
What we see driving Dubai briefs
- A short sea leg from India
Western Indian ports to Jebel Ali is one of the quickest runs we operate, which is why a factory abroad can still hold a Dubai programme date.
- A professional fit-out market
Contractors here compare products line by line and expect documentation with the quote. That suits a manufacturer who can answer for what is in the material.
- Sealed against the heat
Buildings stay closed with heavy cooling running all year, so mechanical noise accumulates and rooms stay live.
- Impact through slabs
Hard flooring over concrete passes footfall straight down between apartments. The underlay goes in before the finish, not after the complaint.
- Plant and HVAC
District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
- The housing stock
Towers and villas are concrete and block with stone or porcelain floors throughout. Mass is not the problem, impact noise and live rooms are.
If you are specifying for a Dubai project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
04 / Climate and durability
The Dubai climate decides the material list
Dubai is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the sensible material list before acoustics is even discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The risk we design against here is dust ingress and thermal movement in long runs.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Supply
What the route into Dubai actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Jebel Ali, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Jebel Ali |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Jebel Ali, then road to site. The short transit means sea works for most programmes. Air freight for samples and urgent quantities.
06 / Straight talk
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
Suppliers who imply a Dubai presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
How it looks once it is installed
Dubai: questions we are actually asked
Do you manufacture soundproofing materials in Dubai?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Dubai as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Jebel Ali. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Dubai job?
Western Indian ports to Jebel Ali is one of the quickest runs we operate, which is why a factory abroad can still hold a Dubai programme date. Contractors here compare products line by line and expect documentation with the quote. That suits a manufacturer who can answer for what is in the material. Those two things move the build-up far more than the panel figure does.
Is this the right material for Dubai conditions?
Dubai is hot and dry for most of the year, with dust and high daytime surface temperatures. Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves. The failure we design against here is dust ingress and thermal movement in long runs.
How does an order actually travel to Dubai?
ships from: Palwal, Haryana, India, arrives at: Jebel Ali, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What is the minimum order and how is it packed?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Tell us the room, we will tell you the build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.