For projects in Dubai
Hospital and healthcare acoustics in Dubai
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
- Consulting room privacy
- Speech privacy between rooms, which is partition, door and ceiling void work.
- Ward noise floor
- Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
- Cleanability
- Non shedding, non absorbent surfaces that survive a cleaning regime.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this is, and what it changes in a Dubai room
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.
District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
Work reaching us from Dubai is mostly hotels and fit-out, towers and apartments, retail and malls, offices, clinics, studios.
- A short sea leg from India Western Indian ports to Jebel Ali is one of the quickest runs we operate, which is why a factory abroad can still hold a Dubai programme date.
- A professional fit-out market Contractors here compare products line by line and expect documentation with the quote. That suits a manufacturer who can answer for what is in the material.
- Sealed against the heat Buildings stay closed with heavy cooling running all year, so mechanical noise accumulates and rooms stay live.
- Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Dubai.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Dubai, district cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Dubai, hotel ballrooms, mosques and conference centres are tall hard volumes where a long tail defeats the speech system before anyone hears a word.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Dubai, international school campuses are new, highly glazed and built to a tight programme. Sports halls, atria and lecture spaces are the rooms that need treating.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
If you are specifying for a Dubai project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What we see driving Dubai briefs
- A short sea leg from India
Western Indian ports to Jebel Ali is one of the quickest runs we operate, which is why a factory abroad can still hold a Dubai programme date.
- A professional fit-out market
Contractors here compare products line by line and expect documentation with the quote. That suits a manufacturer who can answer for what is in the material.
- Sealed against the heat
Buildings stay closed with heavy cooling running all year, so mechanical noise accumulates and rooms stay live.
- Impact through slabs
Hard flooring over concrete passes footfall straight down between apartments. The underlay goes in before the finish, not after the complaint.
- Plant and HVAC
District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work.
04 / Room by room
Space by space, for Dubai briefs
-

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work. Western Indian ports to Jebel Ali is one of the quickest runs we operate, which is why a factory abroad can still hold a Dubai programme date.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. Contractors here compare products line by line and expect documentation with the quote. That suits a manufacturer who can answer for what is in the material.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
-

Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime. Buildings stay closed with heavy cooling running all year, so mechanical noise accumulates and rooms stay live.
- PET felt acoustic panels, 4 to 24 mm
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate and durability
Durability in Dubai, before acoustics is discussed
Dubai is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Before you buy
What we watch go wrong on jobs like this
-
Fabric wrapped products in a clinical area
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Absorption used where privacy was the requirement
Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.
-
Ceiling void left open above a partition
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating it as a generic Dubai job
Western Indian ports to Jebel Ali is one of the quickest runs we operate, which is why a factory abroad can still hold a Dubai programme date.
05 / Route to site
Supply into Dubai, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Jebel Ali, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Jebel Ali |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Jebel Ali, then road to site. The short transit means sea works for most programmes. Air freight for samples and urgent quantities.
Questions from Dubai projects
What makes hospital and healthcare acoustics different in Dubai?
District cooling and large AHU plant run continuously. Duct attenuation, plant room lining and riser treatment do the work. Western Indian ports to Jebel Ali is one of the quickest runs we operate, which is why a factory abroad can still hold a Dubai programme date.
Where should the budget go first on a Dubai project?
Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Do you have an office or installation team in Dubai?
No. We manufacture in India and supply into Dubai. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Dubai site?
ships from: Palwal, Haryana, India, arrives at: Jebel Ali, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.