Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
- Consulting room privacy
- Speech privacy between rooms, which is partition, door and ceiling void work.
- Ward noise floor
- Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
- Cleanability
- Non shedding, non absorbent surfaces that survive a cleaning regime.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this is, and what it changes in a Dibrugarh room
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.
Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
Work reaching us from Dibrugarh is mostly tea processing units, energy sector offices, hospitals, colleges, hotels, assembly halls.
- Processing machinery Driers, sorters and fans running continuously in humid buildings. Enclosure at the source is the reliable answer.
- Very high humidity PET felt does not absorb moisture, shed fibre or feed mould, which matters in a climate where mineral products fail quickly.
- A long supply route Five days by road, confirmed before dispatch, and packed for the journey rather than for a short transfer.
- Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Dibrugarh.
02 / The build-up
The build-up, layer by layer
-

Layer 1
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Dibrugarh, split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Dibrugarh, auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Dibrugarh, schools and colleges are naturally ventilated with open corridors and large class sizes.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
Architects working in Dibrugarh usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / On the ground
The Dibrugarh conditions that change the answer
- Processing machinery
Driers, sorters and fans running continuously in humid buildings. Enclosure at the source is the reliable answer.
- Very high humidity
PET felt does not absorb moisture, shed fibre or feed mould, which matters in a climate where mineral products fail quickly.
- A long supply route
Five days by road, confirmed before dispatch, and packed for the journey rather than for a short transfer.
- Seismic and flood prone
Buildings are designed to move and often raised. A build-up must respect both rather than fight them.
- Plant and HVAC
Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
04 / Room by room
Room by room, on a typical Dibrugarh job
-

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work. Driers, sorters and fans running continuously in humid buildings. Enclosure at the source is the reliable answer.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Ceiling baffles and clouds, 9 to 24 mm
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
-

Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. PET felt does not absorb moisture, shed fibre or feed mould, which matters in a climate where mineral products fail quickly.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
-

Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime. Five days by road, confirmed before dispatch, and packed for the journey rather than for a short transfer.
- PET felt acoustic panels, 4 to 24 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
- SoundBlanket mass loaded vinyl, 5 x 1.2 m, 6 sq m per roll
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Conditions
Durability in Dibrugarh, before acoustics is discussed
Dibrugarh is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Read this first
The six errors that cost the most
-
Fabric wrapped products in a clinical area
Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.
-
Absorption used where privacy was the requirement
If the complaint is being overheard, no amount of absorption inside the room will fix it. That is a partition job and we will say so.
-
Ceiling void left open above a partition
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating it as a generic Dibrugarh job
Driers, sorters and fans running continuously in humid buildings. Enclosure at the source is the reliable answer.
05 / Route to site
What the route into Dibrugarh actually looks like
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | five days |
| Dispatch | 2 to 4 working days |
| To site | five days |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly twenty two hundred kilometres, normally five days on a dedicated truck.
Questions from Dibrugarh projects
What makes hospital and healthcare acoustics different in Dibrugarh?
Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs. Driers, sorters and fans running continuously in humid buildings. Enclosure at the source is the reliable answer.
Where should the budget go first on a Dibrugarh project?
Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Do you have an office or installation team in Dibrugarh?
No. We manufacture in India and supply into Dibrugarh. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Dibrugarh site?
made at: Our own plant, Palwal, Haryana, reaches site in: five days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer