Manufactured in India, supplied in Dehradun
Soundproofing materials in Dehradun
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Dehradun. Dehradun is a school town.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / What it is
The material, and what it actually does on a Dehradun job
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Dehradun is mostly boarding schools and colleges, assembly halls, dormitories, hotels, hospitals, offices.
RC frame houses and hotels built on slopes, with hard floors and cold external walls in the hill towns.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Dehradun.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification sheet
Published specification, identical wherever we ship it
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Where a consultant is already engaged on a Dehradun project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
03 / In this market
The Dehradun conditions that change the answer
- Classrooms defeat the teacher
Hard floors, high ceilings and hard plaster mean a teacher raises their voice all day. Absorption on the ceiling recovers most of it.
- Halls used for everything
Assembly, examinations, performances and sport in one room. The design has to work for speech first and music second.
- Dormitories
Children sleeping next to corridors and each other. Partition and door detailing does more than anything applied inside the room.
- Next day from the plant
A short run, so freight stays low and samples arrive before the order.
- Plant and HVAC
Hotel plant, boilers and generator sets close to guest rooms in compact hillside buildings.
- The housing stock
RC frame houses and hotels built on slopes, with hard floors and cold external walls in the hill towns.
If you are specifying for a Dehradun project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
04 / Climate
The Dehradun climate decides the material list
Dehradun is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
For a Dehradun interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
05 / Logistics
Getting it to Dehradun, with real dates
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | next day |
| Dispatch | 2 to 4 working days |
| To site | next day |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly three hundred kilometres, normally next day on a dedicated truck.
06 / Before you buy
Four honest warnings before you buy
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Square footage quoted before the room is understood
Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.
-
Local approvals that nobody actually holds
We hold no Dehradun certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.
07 / In projects
In finished rooms
Dehradun: questions we are actually asked
Are these soundproofing materials made in Dehradun?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Dehradun as the manufacturer rather than through a dealer. Dehradun is a school town. You buy at factory prices with one consistent batch across the order.
Why would a Dehradun build-up differ from anywhere else?
Hard floors, high ceilings and hard plaster mean a teacher raises their voice all day. Absorption on the ceiling recovers most of it. Assembly, examinations, performances and sport in one room. The design has to work for speech first and music second. Those two things move the build-up far more than the panel figure does.
Is this the right material for Dehradun conditions?
Dehradun is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
When would material land on a Dehradun site?
made at: Our own plant, Palwal, Haryana, reaches site in: next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
What should you not buy soundproofing materials for?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What is the minimum order and how is it packed?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.