For projects in Dammam
Cinema and multiplex soundproofing in Dammam
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The product, described honestly, for a Dammam brief
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Work reaching us from Dammam is mostly industrial plant and control rooms, corporate offices, compound housing, hotels, schools, clinics.
- Industrial noise is a mass problem Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch it and we will say so.
- Control rooms run long shifts Operators listening to alarms and radios for twelve hours need intelligibility and a low background, not a reverberation figure.
- The port is on the doorstep Short road leg, predictable landed cost, and straightforward replacement if something arrives damaged.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Dammam.
02 / The build-up
The build-up, layer by layer
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Dammam, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Dammam, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Dammam, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.
Architects working in Dammam usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / Local conditions
The Dammam conditions that change the answer
- Industrial noise is a mass problem
Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch it and we will say so.
- Control rooms run long shifts
Operators listening to alarms and radios for twelve hours need intelligibility and a low background, not a reverberation figure.
- The port is on the doorstep
Short road leg, predictable landed cost, and straightforward replacement if something arrives damaged.
- Heat, dust and sealed buildings
Closed up with heavy cooling year round, so plant noise accumulates inside rather than escaping.
- Assembly and performance rooms
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
04 / Room by room
Where the money goes on a Dammam project
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch it and we will say so.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Operators listening to alarms and radios for twelve hours need intelligibility and a low background, not a reverberation figure.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
-

Plant and projection
Equipment noise into the auditorium, treated at source. Short road leg, predictable landed cost, and straightforward replacement if something arrives damaged.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate and durability
The Dammam climate decides the material list
Dammam is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Straight talk
Where this kind of project usually fails
-
A shared service void running across the wall line
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating the auditorium to fix bleed from the next screen
It sounds like a small detail until the room is finished and the complaint arrives.
-
Doors and lobbies specified late and undersized
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Dammam job
Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch it and we will say so.
05 / Getting it there
Supply into Dammam, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Dammam, then a short road run across the Eastern Province |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Dammam |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Dammam, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Dammam projects
What makes cinema and multiplex soundproofing different in Dammam?
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief. Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch it and we will say so.
Where should the budget go first on a Dammam project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Dammam?
No. We manufacture in India and supply into Dammam. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Dammam site?
ships from: Palwal, Haryana, India, arrives at: Dammam, then a short road run across the Eastern Province, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.