Home > Colombia > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Colombia

Recording studio acoustics and soundproofing in Colombia

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A strong music and content sector working inside apartment blocks and commercial floors.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / Start here

The material, and what it actually does on a Colombia job

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

A strong music and content sector working inside apartment blocks and commercial floors.

Work reaching us from Colombia is mostly offices, apartments, hotels, restaurants, hospitals, schools, studios.

  • The inland leg is significant The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.
  • Concrete and brick construction Walls carry mass. The recurring problem is hard, live interiors and services noise rather than speech through a wall.
  • Growing hospitality sector Hotel and restaurant fit-out is a steady share of enquiries, and those rooms are judged when they are completely full.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Colombia.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

How the layers stack, from the structure inwards

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Colombia, split units with condensers on facades and in light wells, running through a mild year round climate.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Colombia, church buildings, event halls and auditoria are hard volumes carrying amplified music at high level.

    Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.

  3. ...

    Layer 3

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Colombia, classrooms are concrete and tile with high ceilings, and covered play areas amplify break time noise.

    Full height with return. Curtain taken floor to soffit with a side return and an overlap, because the gap is what leaks, not the fabric.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / On the ground

What the buildings in Colombia do to the specification

  • The inland leg is significant

    The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.

  • Concrete and brick construction

    Walls carry mass. The recurring problem is hard, live interiors and services noise rather than speech through a wall.

  • Growing hospitality sector

    Hotel and restaurant fit-out is a steady share of enquiries, and those rooms are judged when they are completely full.

  • Two coasts to choose from

    Cartagena on the Caribbean or Buenaventura on the Pacific, routed to whichever shortens the run to your site.

  • The housing stock

    Concrete and block construction with hard floors, in apartment towers that share slabs and walls.

  • The studio and content scene

    A strong music and content sector working inside apartment blocks and commercial floors.

04 / Room by room

Space by space, for Colombia briefs

  • Recording studio soundproof wall system

    Isolation

    A measured background level, agreed before anything is bought. The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.

  • Acoustic foam and panels in a recording studio

    Low frequency

    Corner and boundary absorption with real depth, not surface foam. Walls carry mass. The recurring problem is hard, live interiors and services noise rather than speech through a wall.

  • Studio door and control room window

    Early reflections

    Controlled at the mix position, and only there. Hotel and restaurant fit-out is a steady share of enquiries, and those rooms are judged when they are completely full.

For a Colombia interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate

The Colombia climate decides the material list

Colombia is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Before you buy

The six errors that cost the most

  • Buying foam to solve an isolation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating the room before the shell is isolated

    This is the one that comes back as a second fit-out rather than a snag.

  • Killing the room completely and calling it controlled

    A room can be over-treated. Past the target it stops sounding controlled and starts sounding dead, and you paid for that.

  • Treating it as a generic Colombia job

    The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.

05 / Supply

Getting it to Colombia, with real dates

Supply into Colombia
Ships fromPalwal, Haryana, India
Arrives atCartagena or Buenaventura, then road inland
Dispatch4 to 7 working days
FreightSea via Cartagena
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Cartagena or Buenaventura, then road inland. Air freight for samples and urgent quantities.

FAQ

Questions from Colombia projects

What makes recording studio acoustics and soundproofing different in Colombia?

A strong music and content sector working inside apartment blocks and commercial floors. The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.

Where should the budget go first on a Colombia project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Colombia?

No. We manufacture in India and supply into Colombia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Colombia site?

ships from: Palwal, Haryana, India, arrives at: Cartagena or Buenaventura, then road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.