For projects in Colombia
Cinema and multiplex soundproofing in Colombia
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Church buildings, event halls and auditoria are hard volumes carrying amplified music at high level.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Colombia
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Church buildings, event halls and auditoria are hard volumes carrying amplified music at high level.
Work reaching us from Colombia is mostly offices, apartments, hotels, restaurants, hospitals, schools, studios.
- The inland leg is significant The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.
- Concrete and brick construction Walls carry mass. The recurring problem is hard, live interiors and services noise rather than speech through a wall.
- Growing hospitality sector Hotel and restaurant fit-out is a steady share of enquiries, and those rooms are judged when they are completely full.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Colombia.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Colombia, split units with condensers on facades and in light wells, running through a mild year round climate.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Colombia, church buildings, event halls and auditoria are hard volumes carrying amplified music at high level.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Colombia, classrooms are concrete and tile with high ceilings, and covered play areas amplify break time noise.
Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.
Architects working in Colombia usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / On the ground
What the buildings in Colombia do to the specification
- The inland leg is significant
The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.
- Concrete and brick construction
Walls carry mass. The recurring problem is hard, live interiors and services noise rather than speech through a wall.
- Growing hospitality sector
Hotel and restaurant fit-out is a steady share of enquiries, and those rooms are judged when they are completely full.
- Two coasts to choose from
Cartagena on the Caribbean or Buenaventura on the Pacific, routed to whichever shortens the run to your site.
- Assembly and performance rooms
Church buildings, event halls and auditoria are hard volumes carrying amplified music at high level.
04 / Room by room
Space by space, for Colombia briefs
-

Screen to screen
Independent construction between auditoria, with services broken at the line. The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Walls carry mass. The recurring problem is hard, live interiors and services noise rather than speech through a wall.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
-

Plant and projection
Equipment noise into the auditorium, treated at source. Hotel and restaurant fit-out is a steady share of enquiries, and those rooms are judged when they are completely full.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate
Why the climate in Colombia changes the material, not the target
Colombia is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Read this first
What we watch go wrong on jobs like this
-
A shared service void running across the wall line
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating the auditorium to fix bleed from the next screen
Small on the drawing, expensive on site, and almost always found after handover.
-
Doors and lobbies specified late and undersized
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Colombia job
The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.
05 / Getting it there
How material reaches a Colombia site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Cartagena or Buenaventura, then road inland |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Cartagena |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Cartagena or Buenaventura, then road inland. Air freight for samples and urgent quantities.
Questions from Colombia projects
What makes cinema and multiplex soundproofing different in Colombia?
Church buildings, event halls and auditoria are hard volumes carrying amplified music at high level. The commercial centres are well inland and high up. We quote the port leg and the road leg separately so the programme runs on real dates.
Where should the budget go first on a Colombia project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Colombia?
No. We manufacture in India and supply into Colombia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Colombia site?
ships from: Palwal, Haryana, India, arrives at: Cartagena or Buenaventura, then road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.