Home > China > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in China

Soundproofing materials in China

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into China. Made at our own plant in India and shipped into Shanghai, Ningbo or Shenzhen.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.

01 / The material

What this material is and where it earns its place in China

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from China is mostly specification-led projects, international hotel and office fit-out, studios, showrooms.

Reinforced concrete towers with block infill and hard floors. Mass is good, impact noise through the slab and between flats is the complaint.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in China.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / The numbers

Published specification, identical wherever we ship it

We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

03 / Local conditions

What the buildings in China do to the specification

  • We are not the default here

    Domestic supply is abundant and competitive. We are worth importing when the specification, the colour consistency or the supply chain is the reason, not the price.

  • Concrete towers, hard interiors

    The structure blocks well, so the recurring problems are live rooms and impact passing down through slabs.

  • Colour across a large order

    Where a single project runs across many floors, batch to batch consistency is usually the reason people come to a single manufacturer.

  • Well served ports

    Shanghai, Ningbo and Shenzhen all run frequently from India, so routing is straightforward.

  • Plant and HVAC

    Central plant, VRF and split units, with risers and duct runs carrying noise between floors.

  • The housing stock

    Reinforced concrete towers with block infill and hard floors. Mass is good, impact noise through the slab and between flats is the complaint.

If you are specifying for a China project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

04 / Durability

Why the climate in China changes the material, not the target

China is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The risk we design against here is wet-season humidity behind linings.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

05 / Route to site

How material reaches a China site

Supply into China
Ships fromPalwal, Haryana, India
Arrives atShanghai, Ningbo or Shenzhen, then road to site
Dispatch4 to 7 working days
FreightSea via Shanghai or Ningbo
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Shanghai, Ningbo or Shenzhen, then road to site. Air freight for samples and urgent quantities.

06 / Before you buy

What we will tell you that a reseller will not

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Square footage quoted before the room is understood

    Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.

  • Suppliers who imply a China presence

    Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.

07 / In projects

In finished rooms

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

China: questions we are actually asked

Do you manufacture soundproofing materials in China?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into China as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Shanghai, Ningbo or Shenzhen. You buy at factory prices with one consistent batch across the order.

What do you look at first on a China enquiry?

Domestic supply is abundant and competitive. We are worth importing when the specification, the colour consistency or the supply chain is the reason, not the price. The structure blocks well, so the recurring problems are live rooms and impact passing down through slabs. Those two things move the build-up far more than the panel figure does.

Will this material last in the China climate?

China is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.

How does an order actually travel to China?

ships from: Palwal, Haryana, India, arrives at: Shanghai, Ningbo or Shenzhen, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

When are soundproofing materials the wrong purchase?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

What quantity do we have to order, and in what packaging?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send the drawings, get a straight answer

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.