Home > China > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in China

Auditorium acoustics and soundproofing in China

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Auditoria, conference centres and function halls are large hard volumes with long decay.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / The material

What this material is and where it earns its place in China

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Auditoria, conference centres and function halls are large hard volumes with long decay.

Work reaching us from China is mostly specification-led projects, international hotel and office fit-out, studios, showrooms.

  • We are not the default here Domestic supply is abundant and competitive. We are worth importing when the specification, the colour consistency or the supply chain is the reason, not the price.
  • Concrete towers, hard interiors The structure blocks well, so the recurring problems are live rooms and impact passing down through slabs.
  • Colour across a large order Where a single project runs across many floors, batch to batch consistency is usually the reason people come to a single manufacturer.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in China.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The stack, in the order it is installed

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In China, central plant, VRF and split units, with risers and duct runs carrying noise between floors.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

  2. Acoustic hanging ceiling baffles in a large open space

    Layer 2

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In China, auditoria, conference centres and function halls are large hard volumes with long decay.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In China, school buildings are concrete and tile with very large class sizes and long hard corridors.

    Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / Local conditions

What the buildings in China do to the specification

  • We are not the default here

    Domestic supply is abundant and competitive. We are worth importing when the specification, the colour consistency or the supply chain is the reason, not the price.

  • Concrete towers, hard interiors

    The structure blocks well, so the recurring problems are live rooms and impact passing down through slabs.

  • Colour across a large order

    Where a single project runs across many floors, batch to batch consistency is usually the reason people come to a single manufacturer.

  • Well served ports

    Shanghai, Ningbo and Shenzhen all run frequently from India, so routing is straightforward.

  • Assembly and performance rooms

    Auditoria, conference centres and function halls are large hard volumes with long decay.

  • School and campus buildings

    School buildings are concrete and tile with very large class sizes and long hard corridors.

04 / Room by room

Room by room, on a typical China job

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Domestic supply is abundant and competitive. We are worth importing when the specification, the colour consistency or the supply chain is the reason, not the price.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. The structure blocks well, so the recurring problems are live rooms and impact passing down through slabs.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Where a single project runs across many floors, batch to batch consistency is usually the reason people come to a single manufacturer.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate and durability

Durability in China, before acoustics is discussed

China is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a China job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Before you buy

Six mistakes that turn into a second fit-out

  • Absorbing the whole room and losing the back rows

    Small on the drawing, expensive on site, and almost always found after handover.

  • Adding speakers to fix a reverberation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Ignoring the rear wall because it is behind the audience

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic China job

    Domestic supply is abundant and competitive. We are worth importing when the specification, the colour consistency or the supply chain is the reason, not the price.

05 / Logistics

Supply into China, start to site

Supply into China
Ships fromPalwal, Haryana, India
Arrives atShanghai, Ningbo or Shenzhen, then road to site
Dispatch4 to 7 working days
FreightSea via Shanghai or Ningbo
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Shanghai, Ningbo or Shenzhen, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from China projects

What makes auditorium acoustics and soundproofing different in China?

Auditoria, conference centres and function halls are large hard volumes with long decay. Domestic supply is abundant and competitive. We are worth importing when the specification, the colour consistency or the supply chain is the reason, not the price.

Where should the budget go first on a China project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in China?

No. We manufacture in India and supply into China. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a China site?

ships from: Palwal, Haryana, India, arrives at: Shanghai, Ningbo or Shenzhen, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.