For projects in Berlin
Venue and restaurant acoustics in Berlin
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Concert halls, church buildings and civic Saal spaces are long-reverberation rooms where any intervention has to be reversible and visually disciplined.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this material is and where it earns its place in Berlin
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Concert halls, church buildings and civic Saal spaces are long-reverberation rooms where any intervention has to be reversible and visually disciplined.
Work reaching us from Berlin is mostly altbau flats, studios, clubs, startup offices, schools, clinics.
- Club and live venues Berlin nightlife runs long hours beside housing. Low frequency containment is the whole job, and it is structural, not decorative.
- Altbau floors Timber joists with fill between them pass footfall and speech. Adding mass and a resilient layer works better than anything fixed to the ceiling underneath.
- Courtyard buildings Hinterhof layouts bounce plant noise and voices between facing windows, which turns one noisy unit into a block wide problem.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Berlin.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
What goes where, from the structure in
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Berlin, mechanical ventilation with heat recovery is standard in newer stock, so duct-borne noise and terminal unit noise are the sources rather than open windows.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Berlin, concert halls, church buildings and civic Saal spaces are long-reverberation rooms where any intervention has to be reversible and visually disciplined.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 3
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Berlin, school and university buildings are built to a high thermal standard with hard, cleanable surfaces. Speech clarity in classrooms and long corridors is where the acoustic budget goes.
Slats on felt backing. The standard. Absorption comes from the backing behind the gaps, so the slat gap ratio is an acoustic decision, not only a visual one.
If you are specifying for a Berlin project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / Local conditions
What the buildings in Berlin do to the specification
- Club and live venues
Berlin nightlife runs long hours beside housing. Low frequency containment is the whole job, and it is structural, not decorative.
- Altbau floors
Timber joists with fill between them pass footfall and speech. Adding mass and a resilient layer works better than anything fixed to the ceiling underneath.
- Courtyard buildings
Hinterhof layouts bounce plant noise and voices between facing windows, which turns one noisy unit into a block wide problem.
- Cold winters, sealed rooms
Tight, well insulated rooms sound dead in the wrong way. Balanced absorption matters as much as isolation.
- Assembly and performance rooms
Concert halls, church buildings and civic Saal spaces are long-reverberation rooms where any intervention has to be reversible and visually disciplined.
04 / Room by room
Space by space, for Berlin briefs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Berlin nightlife runs long hours beside housing. Low frequency containment is the whole job, and it is structural, not decorative.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. Timber joists with fill between them pass footfall and speech. Adding mass and a resilient layer works better than anything fixed to the ceiling underneath.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Wooden slat acoustic panels, 14, 16 and 18 mm
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Hinterhof layouts bounce plant noise and voices between facing windows, which turns one noisy unit into a block wide problem.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- Wooden slat acoustic panels, 96 sq ft per unit
For a Berlin interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate and durability
Durability in Berlin, before acoustics is discussed
Berlin is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Straight talk
What we watch go wrong on jobs like this
-
Panels on the wall as a neighbour noise solution
It sounds like a small detail until the room is finished and the complaint arrives.
-
A lobby with both doors able to open at once
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Extract ducting that bypasses every wall you built
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Treating it as a generic Berlin job
Berlin nightlife runs long hours beside housing. Low frequency containment is the whole job, and it is structural, not decorative.
05 / Supply
How material reaches a Berlin site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Hamburg or Bremerhaven |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Hamburg |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order.
Sea freight into Hamburg or Bremerhaven, then road to Berlin. Air freight for samples and urgent quantities.
Questions from Berlin projects
What makes venue and restaurant acoustics different in Berlin?
Concert halls, church buildings and civic Saal spaces are long-reverberation rooms where any intervention has to be reversible and visually disciplined. Timber joists with fill between them pass footfall and speech. Adding mass and a resilient layer works better than anything fixed to the ceiling underneath.
Where should the budget go first on a Berlin project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Berlin?
No. We manufacture in India and supply into Berlin. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Berlin site?
ships from: Palwal, Haryana, India, arrives at: Hamburg or Bremerhaven, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.