Home > Bangkok > Venue and restaurant acoustics

Nightclub and premium restaurant interior with acoustic treatment

For projects in Bangkok

Venue and restaurant acoustics in Bangkok

Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other.
Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a Bangkok job

Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.

Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

Work reaching us from Bangkok is mostly condo towers, hotels and lounges, offices, restaurants, clinics, studios.

  • Concrete towers, live interiors The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.
  • Elevated rail and traffic Trains and traffic close to facades put noise in through glazing, not through the wall. Fix the window path first.
  • Impact through slabs Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix.
  • Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Bangkok.

Nightclub and venue soundproofing SoundBlanket mass loaded vinyl

02 / The build-up

How the layers stack, from the structure inwards

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Bangkok, split units and VRF with condensers on balconies and in light wells, running at full load most of the year.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Bangkok, temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

  3. Acoustic wooden slat wall and ceiling in a premium auditorium

    Layer 3

    Wooden slat acoustic panels

    Timber slats on an acoustic backing. In Bangkok, classrooms are hard and naturally ventilated, open to traffic and corridor noise, with large class sizes pushing levels up.

    Feature wall only. Slats where they are seen, plain felt elsewhere, to hold the budget where it shows.

Architects working in Bangkok usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What decides the build-up in Bangkok

  • Concrete towers, live interiors

    The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.

  • Elevated rail and traffic

    Trains and traffic close to facades put noise in through glazing, not through the wall. Fix the window path first.

  • Impact through slabs

    Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix.

  • Heat and humidity all year

    Our PET felt does not hold moisture or feed mould, which matters where mineral products sag in a tropical climate.

  • Assembly and performance rooms

    Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

04 / Room by room

Space by space, for Bangkok briefs

  • Wall and ceiling soundproofing layers

    Containment

    Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.

  • Walls with wood wool, felt and wooden slats

    Table level comfort

    Absorption at the ceiling so guests stop raising their voices at each other. Trains and traffic close to facades put noise in through glazing, not through the wall. Fix the window path first.

  • Ceiling baffles and clouds in hospitality space

    Entrance and service

    Doors, lobbies and extract paths, which is where most of the leakage actually is. Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Durability

The Bangkok climate decides the material list

Bangkok is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Worth knowing

The six errors that cost the most

  • Panels on the wall as a neighbour noise solution

    This is the one that comes back as a second fit-out rather than a snag.

  • A lobby with both doors able to open at once

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Extract ducting that bypasses every wall you built

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Treating it as a generic Bangkok job

    The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.

05 / Logistics

What the route into Bangkok actually looks like

Supply into Bangkok
Ships fromPalwal, Haryana, India
Arrives atLaem Chabang, then a short road run into Bangkok
Dispatch4 to 7 working days
FreightSea via Laem Chabang
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Laem Chabang, then a short road run into Bangkok. Air freight for samples and urgent quantities.

FAQ

Questions from Bangkok projects

What makes venue and restaurant acoustics different in Bangkok?

Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music. The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.

Where should the budget go first on a Bangkok project?

Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.

Do you have an office or installation team in Bangkok?

No. We manufacture in India and supply into Bangkok. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Bangkok site?

ships from: Palwal, Haryana, India, arrives at: Laem Chabang, then a short road run into Bangkok, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.