Cinema and multiplex soundproofing in Bangkok

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / The material

What you are buying, and what it fixes in Bangkok

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

Work reaching us from Bangkok is mostly condo towers, hotels and lounges, offices, restaurants, clinics, studios.

  • Concrete towers, live interiors The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.
  • Elevated rail and traffic Trains and traffic close to facades put noise in through glazing, not through the wall. Fix the window path first.
  • Impact through slabs Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Bangkok.

Multiplex and cinema soundproofing

02 / The build-up

The stack, in the order it is installed

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Bangkok, split units and VRF with condensers on balconies and in light wells, running at full load most of the year.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Bangkok, temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Bangkok, classrooms are hard and naturally ventilated, open to traffic and corridor noise, with large class sizes pushing levels up.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

What decides the build-up in Bangkok

  • Concrete towers, live interiors

    The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.

  • Elevated rail and traffic

    Trains and traffic close to facades put noise in through glazing, not through the wall. Fix the window path first.

  • Impact through slabs

    Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix.

  • Heat and humidity all year

    Our PET felt does not hold moisture or feed mould, which matters where mineral products sag in a tropical climate.

  • Assembly and performance rooms

    Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

04 / Room by room

Room by room, on a typical Bangkok job

  • Cinema hall with acoustic fabric wall system

    Screen to screen

    Independent construction between auditoria, with services broken at the line. The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.

  • Felt acoustic panels in multiplex cinema

    In room response

    Heavy absorption on side and rear walls so the mix is heard as intended. Trains and traffic close to facades put noise in through glazing, not through the wall. Fix the window path first.

  • Acoustic foams and bass traps in cinema hall

    Plant and projection

    Equipment noise into the auditorium, treated at source. Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

What the Bangkok climate rules in and rules out

Bangkok is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Read this first

What we watch go wrong on jobs like this

  • A shared service void running across the wall line

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating the auditorium to fix bleed from the next screen

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Doors and lobbies specified late and undersized

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Treating it as a generic Bangkok job

    The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.

05 / Getting it there

Supply into Bangkok, start to site

Supply into Bangkok
Ships fromPalwal, Haryana, India
Arrives atLaem Chabang, then a short road run into Bangkok
Dispatch4 to 7 working days
FreightSea via Laem Chabang
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Laem Chabang, then a short road run into Bangkok. Air freight for samples and urgent quantities.

FAQ

Questions from Bangkok projects

What makes cinema and multiplex soundproofing different in Bangkok?

Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music. The structure blocks a lot already. The problem is tile, glass and stone inside making the room ring, and that is a treatment job.

Where should the budget go first on a Bangkok project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in Bangkok?

No. We manufacture in India and supply into Bangkok. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Bangkok site?

ships from: Palwal, Haryana, India, arrives at: Laem Chabang, then a short road run into Bangkok, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.