For projects in Bali
Office acoustics and soundproofing in Bali
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units everywhere, with condensers on balconies and light wells that channel noise straight back into bedrooms.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this material is and where it earns its place in Bali
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Split units everywhere, with condensers on balconies and light wells that channel noise straight back into bedrooms.
Work reaching us from Bali is mostly resorts and villas, beach clubs and restaurants, spas, offices, guest rooms.
- Buildings that are only partly enclosed Open pavilions and sliding walls mean there is often no envelope to isolate. The honest answer is treating what is there and telling you what cannot be fixed.
- Beach clubs and neighbours Late trading venues beside villas and other resorts, where containment of low frequency is what keeps the operation on good terms.
- Humidity and salt destroy the wrong material PET felt does not absorb moisture, rot or feed mould. Mineral products sag here within a single season.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Bali.
Office and conference room acoustics Acoustic office screens
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Bali, split units everywhere, with condensers on balconies and light wells that channel noise straight back into bedrooms.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Bali, places of worship, function halls and community buildings are large hard rooms carrying amplified speech and music.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Bali, classrooms are hard, naturally ventilated and open to corridor and street noise, so absorption alone will not fix intelligibility.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
If you are specifying for a Bali project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What we see driving Bali briefs
- Buildings that are only partly enclosed
Open pavilions and sliding walls mean there is often no envelope to isolate. The honest answer is treating what is there and telling you what cannot be fixed.
- Beach clubs and neighbours
Late trading venues beside villas and other resorts, where containment of low frequency is what keeps the operation on good terms.
- Humidity and salt destroy the wrong material
PET felt does not absorb moisture, rot or feed mould. Mineral products sag here within a single season.
- An onward leg to the island
Material arrives and then continues by road or ferry. Tell us and we pack for the second journey.
- Plant and HVAC
Split units everywhere, with condensers on balconies and light wells that channel noise straight back into bedrooms.
04 / Room by room
Space by space, for Bali briefs
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Open pavilions and sliding walls mean there is often no envelope to isolate. The honest answer is treating what is there and telling you what cannot be fixed.
- Acoustic carpet and rugs, 500 x 500 mm
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. Late trading venues beside villas and other resorts, where containment of low frequency is what keeps the operation on good terms.
- Acoustic carpet and rugs, 4 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. PET felt does not absorb moisture, rot or feed mould. Mineral products sag here within a single season.
- Acoustic carpet and rugs, High density polyester
- Acoustic panels, ASTM C423
- SoundBlanket mass loaded vinyl, 5 x 1.2 m, 6 sq m per roll
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Durability
What the Bali climate rules in and rules out
Bali is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Straight talk
Six mistakes that turn into a second fit-out
-
Lining every wall while leaving the ceiling bare
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating a privacy problem with absorption
Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.
-
Glass cabins specified without a door and head detail
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Bali job
Open pavilions and sliding walls mean there is often no envelope to isolate. The honest answer is treating what is there and telling you what cannot be fixed.
05 / Getting it there
How material reaches a Bali site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Surabaya or Benoa, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Surabaya or Benoa |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Surabaya or Benoa, then road or ferry onward to site. Air freight for samples.
Questions from Bali projects
What makes office acoustics and soundproofing different in Bali?
Split units everywhere, with condensers on balconies and light wells that channel noise straight back into bedrooms. Open pavilions and sliding walls mean there is often no envelope to isolate. The honest answer is treating what is there and telling you what cannot be fixed.
Where should the budget go first on a Bali project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Bali?
No. We manufacture in India and supply into Bali. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Bali site?
ships from: Palwal, Haryana, India, arrives at: Surabaya or Benoa, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.