Home > Aurangabad > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Aurangabad

Soundproofing materials in Aurangabad

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Aurangabad. Aurangabad is an automotive component belt beside a major heritage tourism circuit, so plant rooms and hotels arrive together.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.

01 / Start here

The product, described honestly, for a Aurangabad brief

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Aurangabad is mostly automotive component plants, hotels, colleges, hospitals, offices, auditoriums.

Towers and chawls side by side, in RC frame with tile floors. Redevelopment stock shares slabs and lift cores, and monsoon damp rules out anything that holds moisture.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Aurangabad.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Specification sheet

Published specification, identical wherever we ship it

We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

Where a consultant is already engaged on a Aurangabad project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

03 / Local conditions

The Aurangabad conditions that change the answer

  • Presses and conveyors

    Continuous machinery running all shift. Enclosure and barrier at the source, not absorption on a far wall.

  • Test and QC rooms

    Measurement spaces that need a genuinely low background before any reading means anything.

  • Seasonal hotel occupancy

    Rooms full in season and empty out of it, so the design has to work at capacity.

  • Three days by road

    A dedicated truck from Palwal, with samples sent ahead so the finish is approved first.

  • Plant and HVAC

    Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.

  • The housing stock

    Towers and chawls side by side, in RC frame with tile floors. Redevelopment stock shares slabs and lift cores, and monsoon damp rules out anything that holds moisture.

If you are specifying for a Aurangabad project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

04 / Climate

What the Aurangabad climate rules in and rules out

Aurangabad is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The risk we design against here is mould, sagging fabric finishes and swelling in timber.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

05 / Supply

Getting it to Aurangabad, with real dates

Supply into Aurangabad
Made atOur own plant, Palwal, Haryana
Reaches site inthree days
Dispatch2 to 4 working days
To sitethree days
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly twelve hundred kilometres, normally three days on a dedicated truck.

06 / Worth knowing

The things worth knowing before you place the order

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • A number chased without a measurement

    If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.

  • Suppliers who imply a Aurangabad presence

    Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.

07 / In projects

The product on finished jobs

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Aurangabad: questions we are actually asked

Is there a Aurangabad factory behind this product?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Aurangabad as the manufacturer rather than through a dealer. Aurangabad is an automotive component belt beside a major heritage tourism circuit, so plant rooms and hotels arrive together. You buy at factory prices with one consistent batch across the order.

What do you look at first on a Aurangabad enquiry?

Continuous machinery running all shift. Enclosure and barrier at the source, not absorption on a far wall. Measurement spaces that need a genuinely low background before any reading means anything. Those two things move the build-up far more than the panel figure does.

Does Aurangabad weather shorten the life of this material?

Aurangabad is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.

What is the delivery time into Aurangabad?

made at: Our own plant, Palwal, Haryana, reaches site in: three days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

What will soundproofing materials not do?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

Is there a minimum order, and how does it arrive?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send the drawings, get a straight answer

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.