Home > Atlanta > Hospital and healthcare acoustics

Hospital corridor with acoustic ceiling and wall treatment

For projects in Atlanta

Hospital and healthcare acoustics in Atlanta

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job.

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work.
Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime.
Quote
From a plan and a section, within 48 hours

01 / Start here

What this is, and what it changes in a Atlanta room

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.

Packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job.

Work reaching us from Atlanta is mostly production stages, edit and mix rooms, offices, schools, clinics, restaurants, home theatres.

  • Savannah, then the road The container lands at the coast and drives in. We quote the sea leg and the road leg separately so the programme is built on real dates.
  • Production rooms have no tolerance A mix room or a stage either isolates or it does not. There is no partial credit, which is why we design the shell before anyone chooses a fabric colour.
  • Warehouse conversions Big metal and concrete shells make superb volume and terrible acoustics. Rain on a metal deck and traffic outside both get in, and the inside is completely live.
  • Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Atlanta.

Hospital soundproofing

02 / The build-up

What goes where, from the structure in

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Atlanta, packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Atlanta, churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

    Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Atlanta, public school buildings run long corridors with hard floors and lay-in tile ceilings that were chosen for cost, not for speech. Classroom reverberation and corridor spill are the two complaints, and both respond to ceiling area rather than wall panels.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

Architects working in Atlanta usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What decides the build-up in Atlanta

  • Savannah, then the road

    The container lands at the coast and drives in. We quote the sea leg and the road leg separately so the programme is built on real dates.

  • Production rooms have no tolerance

    A mix room or a stage either isolates or it does not. There is no partial credit, which is why we design the shell before anyone chooses a fabric colour.

  • Warehouse conversions

    Big metal and concrete shells make superb volume and terrible acoustics. Rain on a metal deck and traffic outside both get in, and the inside is completely live.

  • Light frame residential

    Homes and apartments here are gypsum on studs, which passes low frequency far more easily than masonry. Added mass and a decoupled layer do the work, not absorption.

  • Plant and HVAC

    Packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job.

04 / Room by room

Room by room, on a typical Atlanta job

  • Hospital consultation room with acoustic wall treatment

    Consulting room privacy

    Speech privacy between rooms, which is partition, door and ceiling void work. The container lands at the coast and drives in. We quote the sea leg and the road leg separately so the programme is built on real dates.

  • Hospital corridor with acoustic ceiling baffles and clouds

    Ward noise floor

    Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. A mix room or a stage either isolates or it does not. There is no partial credit, which is why we design the shell before anyone chooses a fabric colour.

  • Hospital corridor doors with acoustic seals and curtains

    Cleanability

    Non shedding, non absorbent surfaces that survive a cleaning regime. Big metal and concrete shells make superb volume and terrible acoustics. Rain on a metal deck and traffic outside both get in, and the inside is completely live.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

The Atlanta climate decides the material list

Atlanta is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

Where a consultant is already engaged on a Atlanta project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • Fabric wrapped products in a clinical area

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Absorption used where privacy was the requirement

    Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.

  • Ceiling void left open above a partition

    The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.

  • Treating it as a generic Atlanta job

    The container lands at the coast and drives in. We quote the sea leg and the road leg separately so the programme is built on real dates.

05 / Getting it there

Supply into Atlanta, start to site

Supply into Atlanta
Ships fromPalwal, Haryana, India
Arrives atSavannah, then road to Atlanta
Dispatch4 to 7 working days
FreightSea via Savannah
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg to the US East Coast is long, so plan the full door to door window. We give real dates rather than optimistic ones.

Sea freight into Savannah, then road to Atlanta. Air freight for samples, colour approvals and genuinely urgent quantities.

FAQ

Questions from Atlanta projects

What makes hospital and healthcare acoustics different in Atlanta?

Packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job. A mix room or a stage either isolates or it does not. There is no partial credit, which is why we design the shell before anyone chooses a fabric colour.

Where should the budget go first on a Atlanta project?

Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.

Do you have an office or installation team in Atlanta?

No. We manufacture in India and supply into Atlanta. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Atlanta site?

ships from: Palwal, Haryana, India, arrives at: Savannah, then road to Atlanta, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg to the US East Coast is long, so plan the full door to door window. We give real dates rather than optimistic ones.

What goes wrong most often on this kind of project?

Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.

script src="/assets/vendor/glightbox/js/glightbox.min.js">