Manufactured in India, supplied in Amritsar
Soundproofing materials in Amritsar
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Amritsar. Amritsar feeds and houses enormous numbers of visitors, which means very large halls where a crowd has to hear one voice.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.
01 / Start here
The product, described honestly, for a Amritsar brief
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Amritsar is mostly large dining and assembly halls, hotels and guest houses, restaurants, schools, clinics, offices.
Independent houses and RC frame apartments with stone and tile floors, in towns with agricultural and light industrial activity nearby.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Amritsar.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
The numbers, and they do not move by city
The specification below is the same everywhere we supply, because a specification that changed by city would not be a specification. What changes is which grade and build-up is the right buy, and that is what the rest of this page is about.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Where a consultant is already engaged on a Amritsar project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
03 / On the ground
What the buildings in Amritsar do to the specification
- Halls handling continuous crowds
Very large rooms in constant use, where intelligibility fails long before anyone describes the room as echoing.
- Guest rooms in dense streets
Corridor noise and the room next door cause more complaints than the room itself. Door and partition detailing does that work.
- Old city access
Narrow lanes near the centre mean a lorry often cannot reach the door. We break pallets down to what can be carried.
- One to two days by road
A dedicated truck from Palwal, with samples sent ahead so the finish is approved first.
- Plant and HVAC
Agro processing and light engineering plant, with generator sets and machinery close to occupied buildings.
- The housing stock
Independent houses and RC frame apartments with stone and tile floors, in towns with agricultural and light industrial activity nearby.
For a Amritsar practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Durability
The Amritsar climate decides the material list
Amritsar is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Logistics
How material reaches a Amritsar site
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | one to two days |
| Dispatch | 2 to 4 working days |
| To site | one to two days |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly four hundred and fifty kilometres, normally one to two days on a dedicated truck.
06 / Before you buy
What we will tell you that a reseller will not
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
Suppliers who imply a Amritsar presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
The product on finished jobs
Amritsar: questions we are actually asked
Is there a Amritsar factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Amritsar as the manufacturer rather than through a dealer. Amritsar feeds and houses enormous numbers of visitors, which means very large halls where a crowd has to hear one voice. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Amritsar job?
Very large rooms in constant use, where intelligibility fails long before anyone describes the room as echoing. Corridor noise and the room next door cause more complaints than the room itself. Door and partition detailing does that work. Those two things move the build-up far more than the panel figure does.
Is this the right material for Amritsar conditions?
Amritsar is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
When would material land on a Amritsar site?
made at: Our own plant, Palwal, Haryana, reaches site in: one to two days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
Is there a minimum order, and how does it arrive?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Tell us the room, we will tell you the build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.