Manufactured in India, supplied in Albania
Soundproofing materials in Albania
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Albania. Made at our own plant in India and shipped into Durrës, then a short road run to almost anywhere in the country.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We make this ourselves and ship it to you. No local branch, no borrowed certifications, no dealer margin. One batch across the whole order, and an honest answer when the product is wrong for the problem.
01 / The product
What you are buying, and what it fixes in Albania
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Albania is mostly coastal hotels and resorts, apartment blocks, restaurants, offices, schools, clinics.
Concrete frame with block infill and hard floors, in blocks that sit close together with narrow gaps between them.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Albania.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
The numbers, and they do not move by city
Nothing below changes by location. The decisions that do change are grade, thickness and how the material is mounted, and those are covered further down.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
03 / In this market
What decides the build-up in Albania
- Season openings do not move
Coastal work has to finish before the season starts. Real dispatch and transit dates matter more here than a marginally better price.
- Concrete blocks, hard interiors
The structure carries mass, so the recurring problem is rooms that are simply too live and impact passing down through slabs.
- A small country, a short road leg
Durrës is close to most sites, which keeps the inland cost low and the landed price predictable.
- Coastal humidity and salt
PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag within a couple of seasons.
- Plant and HVAC
Split units with condensers on facades and in light wells close to bedrooms.
- The housing stock
Concrete frame with block infill and hard floors, in blocks that sit close together with narrow gaps between them.
We would rather argue about the build-up at design stage than on site. See how we support architects.
04 / Climate
The Albania climate decides the material list
Albania is mild summers and cold, wet winters, and that narrows the sensible material list before acoustics is even discussed.
Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.
The risk we design against here is condensation and cold bridging behind new linings.
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
05 / Route to site
Supply into Albania, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Durrës, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Durrës |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Durrës, then a short road run to site. Air freight for samples and urgent quantities.
06 / Worth knowing
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
Suppliers who imply a Albania presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
The material in real interiors
Albania: questions we are actually asked
Where are the soundproofing materials you supply to Albania actually made?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Albania as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Durrës, then a short road run to almost anywhere in the country. You buy at factory prices with one consistent batch across the order.
Why would a Albania build-up differ from anywhere else?
Coastal work has to finish before the season starts. Real dispatch and transit dates matter more here than a marginally better price. The structure carries mass, so the recurring problem is rooms that are simply too live and impact passing down through slabs. Those two things move the build-up far more than the panel figure does.
Does Albania weather shorten the life of this material?
Albania is mild summers and cold, wet winters. Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air. The failure we design against here is condensation and cold bridging behind new linings.
How does an order actually travel to Albania?
ships from: Palwal, Haryana, India, arrives at: Durrës, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Where do soundproofing materials fail to help?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What is the minimum order and how is it packed?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.