Home > Agra > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Agra

Soundproofing materials in Agra

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Agra. Agra is a hotel city with a footwear and leather industry behind it, and both come to us for very different reasons.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

We make this ourselves and ship it to you. No local branch, no borrowed certifications, no dealer margin. One batch across the whole order, and an honest answer when the product is wrong for the problem.

01 / The material

What this is, and what it changes in a Agra room

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Agra is mostly hotels and guest houses, footwear and leather units, restaurants, offices, schools, clinics.

Independent houses and builder flats in brick and RC frame, often built floor by floor for different households, so the slab between them was never detailed as a separation.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Agra.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Data sheet

The published figures, unchanged by location

These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

On a Agra job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

03 / In this market

What the buildings in Agra do to the specification

  • Guest rooms fail at the door

    Corridor noise and the room next door generate more complaints than room acoustics ever do. Door and partition detailing does that work.

  • Footwear and leather units

    Machinery and presses running long shifts close to occupied areas. Enclosure at the source rather than lining the hall.

  • Dense old city access

    Narrow lanes near the heritage area mean a lorry often cannot reach the door. Tell us and we break the pallets down.

  • Next day from the plant

    A short run, so freight stays cheap and samples reach you quickly.

  • Plant and HVAC

    Split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.

  • The housing stock

    Independent houses and builder flats in brick and RC frame, often built floor by floor for different households, so the slab between them was never detailed as a separation.

For a Agra practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

04 / Climate

Why the climate in Agra changes the material, not the target

Agra is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The risk we design against here is wet-season humidity behind linings.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

05 / Route to site

What the route into Agra actually looks like

Supply into Agra
Made atOur own plant, Palwal, Haryana
Reaches site innext day
Dispatch2 to 4 working days
To sitenext day
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly one hundred and eighty kilometres, normally next day on a dedicated truck.

06 / Worth knowing

Four honest warnings before you buy

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • Local approvals that nobody actually holds

    We hold no Agra certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.

07 / In projects

How it looks once it is installed

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Agra: questions we are actually asked

Where are the soundproofing materials you supply to Agra actually made?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Agra as the manufacturer rather than through a dealer. Agra is a hotel city with a footwear and leather industry behind it, and both come to us for very different reasons. You buy at factory prices with one consistent batch across the order.

What changes the specification on a Agra job?

Corridor noise and the room next door generate more complaints than room acoustics ever do. Door and partition detailing does that work. Machinery and presses running long shifts close to occupied areas. Enclosure at the source rather than lining the hall. Those two things move the build-up far more than the panel figure does.

Is this the right material for Agra conditions?

Agra is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.

How does an order actually travel to Agra?

made at: Our own plant, Palwal, Haryana, reaches site in: next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

When are soundproofing materials the wrong purchase?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

What is the minimum order and how is it packed?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send the drawings, get a straight answer

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.