Home > Vienna > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Vienna

HVAC, plant and machine noise control in Vienna

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Mechanical ventilation with heat recovery in newer buildings, so duct-borne noise is the source.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / The material

What this is, and what it changes in a Vienna room

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Mechanical ventilation with heat recovery in newer buildings, so duct-borne noise is the source.

Work reaching us from Vienna is mostly gründerzeit apartments, offices, studios, restaurants, clinics, schools, hotels.

  • Gründerzeit rooms are tall and hard High ceilings and lime plaster hold sound for a long time. A room can look perfect and still be unusable for speech until something absorbent goes high on the wall or across the ceiling.
  • Timber floors between apartments Footfall travels down through the joists into the flat below. A resilient layer under the finish does far more than anything applied to the ceiling underneath.
  • Quiet hours are taken seriously Neighbour complaints here are not shrugged off. The isolation layer is what protects a home studio, a practice room or a late venue from becoming somebody else problem.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Vienna.

HVAC duct soundproofing Machine noise control

02 / The build-up

The build-up, layer by layer

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Vienna, mechanical ventilation with heat recovery in newer buildings, so duct-borne noise is the source.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Vienna, concert halls, church buildings and civic rooms are long-reverberation volumes where any intervention must be reversible.

    Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.

  3. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 3

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Vienna, school and university rooms are built to a high standard with hard surfaces, and lecture spaces need intelligibility over a long tail.

    Corner loading. Low frequency energy collects in corners, so absorber in the corners does more than the same area spread across a wall.

If you are specifying for a Vienna project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / On the ground

What the buildings in Vienna do to the specification

  • Gründerzeit rooms are tall and hard

    High ceilings and lime plaster hold sound for a long time. A room can look perfect and still be unusable for speech until something absorbent goes high on the wall or across the ceiling.

  • Timber floors between apartments

    Footfall travels down through the joists into the flat below. A resilient layer under the finish does far more than anything applied to the ceiling underneath.

  • Quiet hours are taken seriously

    Neighbour complaints here are not shrugged off. The isolation layer is what protects a home studio, a practice room or a late venue from becoming somebody else problem.

  • Trams and the Ring

    Ground level trams and traffic put low frequency into the structure. Panels on a wall will not touch it, and we will say so rather than sell them.

  • Plant and HVAC

    Mechanical ventilation with heat recovery in newer buildings, so duct-borne noise is the source.

04 / Room by room

Room by room, on a typical Vienna job

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. High ceilings and lime plaster hold sound for a long time. A room can look perfect and still be unusable for speech until something absorbent goes high on the wall or across the ceiling.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. Footfall travels down through the joists into the flat below. A resilient layer under the finish does far more than anything applied to the ceiling underneath.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. Neighbour complaints here are not shrugged off. The isolation layer is what protects a home studio, a practice room or a late venue from becoming somebody else problem.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate and durability

Why the climate in Vienna changes the material, not the target

Vienna is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • Absorption on the office wall for a plant room problem

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Ignoring structure borne vibration through the mounts

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Vienna job

    High ceilings and lime plaster hold sound for a long time. A room can look perfect and still be unusable for speech until something absorbent goes high on the wall or across the ceiling.

05 / Logistics

How material reaches a Vienna site

Supply into Vienna
Ships fromPalwal, Haryana, India
Arrives atKoper or Hamburg, then rail and road into Vienna
Dispatch4 to 7 working days
FreightSea via Koper or Hamburg
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Koper or Hamburg, then rail and road into Vienna. Air freight for samples and urgent quantities.

FAQ

Questions from Vienna projects

What makes HVAC, plant and machine noise control different in Vienna?

Mechanical ventilation with heat recovery in newer buildings, so duct-borne noise is the source. High ceilings and lime plaster hold sound for a long time. A room can look perfect and still be unusable for speech until something absorbent goes high on the wall or across the ceiling.

Where should the budget go first on a Vienna project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Vienna?

No. We manufacture in India and supply into Vienna. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Vienna site?

ships from: Palwal, Haryana, India, arrives at: Koper or Hamburg, then rail and road into Vienna, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.