Home > Athens > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Athens

HVAC, plant and machine noise control in Athens

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units with condensers on balconies and in light wells that act as reverberant shafts.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a Athens brief

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units with condensers on balconies and in light wells that act as reverberant shafts.

Work reaching us from Athens is mostly apartment blocks, hotels and short lets, restaurants and roof terraces, offices, clinics, schools.

  • Concrete blocks, hard interiors The structure carries mass, so airborne transfer between flats is rarely the issue. Marble and tile making the room ring is.
  • Impact through slabs Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix, not a treatment below.
  • Roof terraces and late trading Venues operate above and beside homes through a long season, so containment is what protects the operation.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Athens.

HVAC duct soundproofing Machine noise control

02 / The build-up

How the layers stack, from the structure inwards

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Athens, split units with condensers on balconies and in light wells that act as reverberant shafts.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Athens, church buildings, civic halls and open air venues are hard volumes with long decay.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Athens, school buildings are concrete and tile with high ceilings and courtyards that amplify break time noise.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

For a Athens practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / On the ground

The Athens conditions that change the answer

  • Concrete blocks, hard interiors

    The structure carries mass, so airborne transfer between flats is rarely the issue. Marble and tile making the room ring is.

  • Impact through slabs

    Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix, not a treatment below.

  • Roof terraces and late trading

    Venues operate above and beside homes through a long season, so containment is what protects the operation.

  • Piraeus is next to the city

    Direct sea into the port beside Athens keeps landed cost and dates both predictable.

  • Plant and HVAC

    Split units with condensers on balconies and in light wells that act as reverberant shafts.

04 / Room by room

Room by room, on a typical Athens job

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. The structure carries mass, so airborne transfer between flats is rarely the issue. Marble and tile making the room ring is.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. Hard flooring over concrete passes footfall straight down. A resilient underlay before the finish is the fix, not a treatment below.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. Venues operate above and beside homes through a long season, so containment is what protects the operation.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Climate and durability

The Athens climate decides the material list

Athens is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Before you buy

The six errors that cost the most

  • Absorption on the office wall for a plant room problem

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Ignoring structure borne vibration through the mounts

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Athens job

    The structure carries mass, so airborne transfer between flats is rarely the issue. Marble and tile making the room ring is.

05 / Logistics

What the route into Athens actually looks like

Supply into Athens
Ships fromPalwal, Haryana, India
Arrives atPiraeus, then a short road run to site
Dispatch4 to 7 working days
FreightSea via Piraeus
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Piraeus, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Athens projects

What makes HVAC, plant and machine noise control different in Athens?

Split units with condensers on balconies and in light wells that act as reverberant shafts. The structure carries mass, so airborne transfer between flats is rarely the issue. Marble and tile making the room ring is.

Where should the budget go first on a Athens project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Athens?

No. We manufacture in India and supply into Athens. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Athens site?

ships from: Palwal, Haryana, India, arrives at: Piraeus, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.