For projects in Slovenia
HVAC, plant and machine noise control in Slovenia
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Mechanical ventilation in newer buildings and radiators in older stock, with split units throughout.
- At source
- Enclosure, barrier or anti vibration mounts at the machine.
- In the path
- Duct lining, attenuators and lagging on the first run out of the plant.
- At the receiver
- Only after the first two, and only for what is left.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this material is and where it earns its place in Slovenia
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.
Mechanical ventilation in newer buildings and radiators in older stock, with split units throughout.
Work reaching us from Slovenia is mostly timber and alpine buildings, hotels, offices, schools, manufacturing, hospitals.
- The port is the country Koper is a short run from almost everywhere in Slovenia, and it is a route we already operate constantly. That keeps cost and timing predictable.
- Timber construction Light structures pass low frequency easily, so mass and decoupling do the work rather than more absorption.
- Alpine hospitality Resort refurbishment happens in a short window between seasons, so real dates matter more than a marginally better price.
- At source Enclosure, barrier or anti vibration mounts at the machine.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Slovenia.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Slovenia, mechanical ventilation in newer buildings and radiators in older stock, with split units throughout.
With a porous backing. Board over mineral backing where the room needs more than the board alone gives.
-

Layer 2
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Slovenia, church buildings, civic halls and auditoria are hard volumes with long reverberation.
Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Slovenia, school buildings are hard surfaced with long corridors, and gymnasiums double as assembly halls.
Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.
Architects working in Slovenia usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
What decides the build-up in Slovenia
- The port is the country
Koper is a short run from almost everywhere in Slovenia, and it is a route we already operate constantly. That keeps cost and timing predictable.
- Timber construction
Light structures pass low frequency easily, so mass and decoupling do the work rather than more absorption.
- Alpine hospitality
Resort refurbishment happens in a short window between seasons, so real dates matter more than a marginally better price.
- Specified carefully
Work here arrives with numbers attached. Send us the target and we will say plainly what our material reaches.
- Plant and HVAC
Mechanical ventilation in newer buildings and radiators in older stock, with split units throughout.
04 / Room by room
Where the money goes on a Slovenia project
-

At source
Enclosure, barrier or anti vibration mounts at the machine. Koper is a short run from almost everywhere in Slovenia, and it is a route we already operate constantly. That keeps cost and timing predictable.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Wood wool acoustic panels, 20 mm
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

In the path
Duct lining, attenuators and lagging on the first run out of the plant. Light structures pass low frequency easily, so mass and decoupling do the work rather than more absorption.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Wood wool acoustic panels, 400 kg per cubic metre
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

At the receiver
Only after the first two, and only for what is left. Resort refurbishment happens in a short window between seasons, so real dates matter more than a marginally better price.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Wood wool acoustic panels, 0.30
- Ceiling baffles and clouds, ASTM C423
For a Slovenia interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate and durability
What the Slovenia climate rules in and rules out
Slovenia is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
On a Slovenia job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Before you buy
What we watch go wrong on jobs like this
-
Absorption on the office wall for a plant room problem
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Lagging a duct that is carrying the noise as breakout from the fan
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Ignoring structure borne vibration through the mounts
This is the one that comes back as a second fit-out rather than a snag.
-
Treating it as a generic Slovenia job
Koper is a short run from almost everywhere in Slovenia, and it is a route we already operate constantly. That keeps cost and timing predictable.
05 / Logistics
Supply into Slovenia, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Koper, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Koper |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Koper, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Slovenia projects
What makes HVAC, plant and machine noise control different in Slovenia?
Mechanical ventilation in newer buildings and radiators in older stock, with split units throughout. Koper is a short run from almost everywhere in Slovenia, and it is a route we already operate constantly. That keeps cost and timing predictable.
Where should the budget go first on a Slovenia project?
At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.
Do you have an office or installation team in Slovenia?
No. We manufacture in India and supply into Slovenia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Slovenia site?
ships from: Palwal, Haryana, India, arrives at: Koper, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.