Home > Melbourne > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Melbourne

HVAC, plant and machine noise control in Melbourne

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Ducted systems and split units, with outdoor units close to boundaries where neighbour noise limits apply.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a Melbourne job

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Ducted systems and split units, with outdoor units close to boundaries where neighbour noise limits apply.

Work reaching us from Melbourne is mostly live music venues, Victorian terraces, apartments, offices, schools, studios, clinics.

  • Venues that were there first Live rooms in old warehouses with new apartments built alongside. Containment of low frequency is what keeps them operating.
  • Victorian terraces Single skin brick party walls and timber floors. Speech and footfall move between houses easily and mass is the only reliable answer.
  • The port is in the city Direct sea into Melbourne keeps the road leg short, though the sea leg itself is long and we quote it fully.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Melbourne.

HVAC duct soundproofing Machine noise control

02 / The build-up

What goes where, from the structure in

  1. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 1

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Melbourne, ducted systems and split units, with outdoor units close to boundaries where neighbour noise limits apply.

    Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.

  2. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 2

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Melbourne, school halls, community centres and church buildings carry assembly, performance and sport in one hard volume.

    With a porous backing. Board over mineral backing where the room needs more than the board alone gives.

  3. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 3

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Melbourne, school buildings run hard floors and high ceilings, and open plan learning areas make speech intelligibility the central problem rather than echo.

    First reflection points. Mirror trick placement on side walls and ceiling, which is a handful of panels rather than a lined room.

If you are specifying for a Melbourne project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / In this market

What we see driving Melbourne briefs

  • Venues that were there first

    Live rooms in old warehouses with new apartments built alongside. Containment of low frequency is what keeps them operating.

  • Victorian terraces

    Single skin brick party walls and timber floors. Speech and footfall move between houses easily and mass is the only reliable answer.

  • The port is in the city

    Direct sea into Melbourne keeps the road leg short, though the sea leg itself is long and we quote it fully.

  • Variable climate, sealed rooms

    Heating and cooling run hard across the year, so rooms stay closed and sound accumulates inside.

  • Plant and HVAC

    Ducted systems and split units, with outdoor units close to boundaries where neighbour noise limits apply.

04 / Room by room

Where the money goes on a Melbourne project

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. Live rooms in old warehouses with new apartments built alongside. Containment of low frequency is what keeps them operating.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. Single skin brick party walls and timber floors. Speech and footfall move between houses easily and mass is the only reliable answer.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. Direct sea into Melbourne keeps the road leg short, though the sea leg itself is long and we quote it fully.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Conditions

Why the climate in Melbourne changes the material, not the target

Melbourne is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

Where a consultant is already engaged on a Melbourne project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Before you buy

The six errors that cost the most

  • Absorption on the office wall for a plant room problem

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Ignoring structure borne vibration through the mounts

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Melbourne job

    Live rooms in old warehouses with new apartments built alongside. Containment of low frequency is what keeps them operating.

05 / Getting it there

What the route into Melbourne actually looks like

Supply into Melbourne
Ships fromPalwal, Haryana, India
Arrives atPort of Melbourne, then a short road run to site
Dispatch4 to 7 working days
FreightSea via Port of Melbourne
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into the Port of Melbourne, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Melbourne projects

What makes HVAC, plant and machine noise control different in Melbourne?

Ducted systems and split units, with outdoor units close to boundaries where neighbour noise limits apply. Live rooms in old warehouses with new apartments built alongside. Containment of low frequency is what keeps them operating.

Where should the budget go first on a Melbourne project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Melbourne?

No. We manufacture in India and supply into Melbourne. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Melbourne site?

ships from: Palwal, Haryana, India, arrives at: Port of Melbourne, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.