Home > Ethiopia > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Ethiopia

HVAC, plant and machine noise control in Ethiopia

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units and generator sets, with mechanical plant close to occupied areas.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a Ethiopia brief

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units and generator sets, with mechanical plant close to occupied areas.

Work reaching us from Ethiopia is mostly industrial parks, offices, hotels, places of assembly, schools, hospitals.

  • Landlocked, so the road leg counts Djibouti then several hundred kilometres by road. We quote the sea leg and the road leg separately so the date is honest.
  • Packing has to survive the run A long road leg on mixed surfaces is hard on a pallet. We brace and wrap for that rather than for a short port transfer.
  • Industrial parks at scale New manufacturing built quickly, where enclosure and partition detail can still be designed in rather than retrofitted.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Ethiopia.

HVAC duct soundproofing Machine noise control

02 / The build-up

The stack, in the order it is installed

  1. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 1

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Ethiopia, split units and generator sets, with mechanical plant close to occupied areas.

    Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Ethiopia, church buildings and conference halls are tall hard volumes with long reverberation.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Ethiopia, classrooms are concrete and hard surfaced with large class sizes and long corridors.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

Architects working in Ethiopia usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / Local conditions

What decides the build-up in Ethiopia

  • Landlocked, so the road leg counts

    Djibouti then several hundred kilometres by road. We quote the sea leg and the road leg separately so the date is honest.

  • Packing has to survive the run

    A long road leg on mixed surfaces is hard on a pallet. We brace and wrap for that rather than for a short port transfer.

  • Industrial parks at scale

    New manufacturing built quickly, where enclosure and partition detail can still be designed in rather than retrofitted.

  • Large assembly spaces

    Halls and civic spaces built in concrete where speech fails long before the room is called echoey.

  • Plant and HVAC

    Split units and generator sets, with mechanical plant close to occupied areas.

04 / Room by room

Room by room, on a typical Ethiopia job

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. Djibouti then several hundred kilometres by road. We quote the sea leg and the road leg separately so the date is honest.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. A long road leg on mixed surfaces is hard on a pallet. We brace and wrap for that rather than for a short port transfer.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. New manufacturing built quickly, where enclosure and partition detail can still be designed in rather than retrofitted.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

What the Ethiopia climate rules in and rules out

Ethiopia is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Where a consultant is already engaged on a Ethiopia project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Read this first

The six errors that cost the most

  • Absorption on the office wall for a plant room problem

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Ignoring structure borne vibration through the mounts

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Ethiopia job

    Djibouti then several hundred kilometres by road. We quote the sea leg and the road leg separately so the date is honest.

05 / Supply

What the route into Ethiopia actually looks like

Supply into Ethiopia
Ships fromPalwal, Haryana, India
Arrives atDjibouti, then road inland to Addis Ababa
Dispatch4 to 7 working days
FreightSea via Djibouti, then road
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Djibouti, then road inland to Addis Ababa and beyond. Air freight for samples and urgent quantities.

FAQ

Questions from Ethiopia projects

What makes HVAC, plant and machine noise control different in Ethiopia?

Split units and generator sets, with mechanical plant close to occupied areas. Djibouti then several hundred kilometres by road. We quote the sea leg and the road leg separately so the date is honest.

Where should the budget go first on a Ethiopia project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Ethiopia?

No. We manufacture in India and supply into Ethiopia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Ethiopia site?

ships from: Palwal, Haryana, India, arrives at: Djibouti, then road inland to Addis Ababa, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.